We achieved this to ...
Challenge
By introducing onboard flow metering to the fleet of milk collection tankers, what are the cost savings to the Dairy Processor.
Below is a case study on one Australian Dairy that collects 3.5 billion litres of milk annually using 145 tankers delivering to seven unload locations.
This company uses dipstick and weighbridge technology and manual reporting procedures.
This report used a rigorous analytical process to investigate and quantify all accuracy and process improvement savings.
Solution
The introduction of a flow-metering, data acquisition and wireless data transfer system provides numerous opportunities to reduce and eliminate most of the manual data entry and data manipulation activities found in the Transport Office.
Results
Certified accuracyReduces downtimeReduces manual data entry- Hygienic sampling
- Eliminates need for weighing
- Integrated to plant processes
- CIP Monitoring
Download the detailed case study
Download our real-life and detailed case study and get an estimate how much you can save to your company.
Financial Analysis
Detailed improvement opportunities table and detailed financial analysis of a real-life example
Quantitave Benefits
Download to get a clear, fact-based picture, affected KPI list and more to evaluate your improvement idea
CONTACT US
Are you ready to supercharge your milk collection operations?
Click the “start here” button below and we will help you find the information that best suits your research needs.